Soya beans, meal and oil are in the EUDR. Compound feed is not. Here's what that split means for feed mills, importers and compounders, and by when.
On this page
- 01Which soya products are actually in Annex I
- 02Why the finished feed itself isn't the regulated product
- 03Who is the operator in a soya-to-feed chain
- 04Soya beans for sowing: now explicitly out
- 05Where the soya actually comes from changes how much due diligence you do
- 06Geolocation: still plot-level, whatever the final product looks like
- 07When you actually have to file
- 08What to collect from a soya supplier
Soya beans, soya bean flour and meal, soya-bean oil and soya oilcake are all in Annex I of the EUDR, which covers the raw and intermediate soya materials a feed mill buys. Compound and mixed animal feed itself — the finished product, classified under CN 2309 — is not in Annex I and carries no EUDR obligation of its own. The obligation sits with whoever first places the Annex I material on the EU market, typically before it is blended into feed.
Which soya products are actually in Annex I
The EUDR applies only to products whose CN code appears in Annex I of Regulation (EU) 2023/1115. For soya, that list is short and specific:
| Product | CN code | In scope |
|---|---|---|
| Soya beans, whether or not broken | 1201 | Yes |
| Soya bean flour and meal | 1208 10 | Yes |
| Soya-bean oil and its fractions, not chemically modified | 1507 | Yes |
| Oilcake and other solid residues from soya-bean oil extraction (soybean meal) | 2304 | Yes |
| Soya beans for sowing (seed use) | ex 1201 | No, since September 2026 |
| Compound and mixed animal feed preparations | 2309 | No |
The product most feed businesses actually handle in volume is CN 2304 — the high-protein oilcake left over after oil extraction, universally called soybean meal in the feed trade. That is squarely in Annex I. So is CN 1208 10, a separate, lower-volume soya flour and meal product that is not the same material as 2304 despite the similar name.
Why the finished feed itself isn't the regulated product
This is the detail that catches compounders out. The Commission considered adding compound feed preparations (CN 2309) to Annex I during drafting and decided against it, so a bag of finished cattle, pig or poultry feed is not itself a relevant product under the regulation, however much Annex I soya or palm material it contains. FEFAC, the EU compound feed manufacturers' federation, has issued a professional recommendation to its members on exactly this point, covering the two feed materials it affects most directly: soybean meal and palm oil co-products.
That does not mean compounders are outside the regulation's reach. It means the due diligence statement has already had to be filed, further up the chain, by whoever first introduced the soybean meal, flour or oil onto the EU market as an Annex I product. A feed mill that imports crude soybean meal directly from a non-EU crusher is that first operator itself. A feed mill that buys meal from an EU-based trader or crusher who has already filed the statement is not — but it still has to be able to show that the material it bought was covered by one, because EUDR record-keeping rules require operators to be able to trace what they placed on the market, or relied on having been placed, for at least five years.
Who is the operator in a soya-to-feed chain
The regulation's operator/trader split, set out in Article 2, decides who actually has to file:
- The first operator is whoever first makes the Annex I soya product available on the EU market or uses it for their own commercial activity — usually an EU-based importer, crusher or trading house bringing soybeans, meal or oil in from a non-EU country.
- Downstream traders, including most feed compounders buying already-placed meal from an EU supplier, do not need to file their own due diligence statement for that material. Do downstream operators and traders still need a due diligence statement? covers this distinction in full — it is one of the points the 2025 amendment changed.
- An EU farmer growing soya and selling it as a raw material inside the EU is not placing an imported product on the market in the sense Annex I is aimed at, but EU-grown soya is a small share of what EU feed uses; most tonnage is imported.
Get this wrong in either direction and you either file a statement nobody asked you to duplicate, or assume someone upstream filed one when they did not.
Soya beans for sowing: now explicitly out
Commission Delegated Regulation (EU) 2026/2102, in force since September 2026, removed soya beans intended for sowing from Annex I. This matters only to seed suppliers, not to feed businesses — soya bought for crushing into meal or oil, or fed whole, was never affected by this change and remains in scope on the same terms as before. What changed in Annex I under Delegated Regulation 2026/2102 covers the full set of additions and removals the act made, including changes to cattle and rubber products that have nothing to do with soya.
Where the soya actually comes from changes how much due diligence you do
Country benchmarking under Implementing Regulation (EU) 2025/1093 sets one risk tier per country, applied across all seven EUDR commodities — it does not set a separate tier for soya specifically, but the tier a soya-exporting country sits in still decides how much work your due diligence is.
| Origin | Risk tier | What it means for a soya importer |
|---|---|---|
| United States | Low | Simplified due diligence: no risk assessment or mitigation step required by default |
| Brazil | Standard | Full due diligence, including risk assessment and mitigation |
| Argentina | Standard | Full due diligence, including risk assessment and mitigation |
| Paraguay | Standard | Full due diligence, including risk assessment and mitigation |
This is not a minor detail for soya specifically: Brazil is the EU's largest single supplier of soybean meal, with roughly 56% market share as of late 2025 according to USDA Foreign Agricultural Service trade data, and the EU imports around 19–20 million tonnes of soybean meal a year. Most of that tonnage therefore sits in the standard-risk tier, not the low tier, which means the simplified route available under Article 13 is the exception for soya sourcing, not the rule. EUDR country benchmarking explained sets out what standard risk actually requires in practice and how the 1%, 3% and 9% competent authority check rates apply.
Geolocation: still plot-level, whatever the final product looks like
Soya does not get a commodity-specific geolocation simplification the way cattle does. Every plot the soya was grown on needs a geolocation point if it is 4 hectares or smaller, or a polygon if larger, under the standard rule set out in EUDR geolocation requirements. For a crusher or trader blending soya from many smallholder farms into one shipment of meal, that means the geolocation data has to survive aggregation — a single due diligence statement covering a mixed-origin shipment still has to reference every plot of origin, not an averaged or representative one.
When you actually have to file
| Operator type | Deadline |
|---|---|
| Large and medium operators and traders | 30 December 2026 |
| Micro and small operators whose products were already under the EU Timber Regulation | 30 December 2026 |
| Other micro and small operators (most soya-handling feed businesses) | 30 June 2027 |
Soya was never a timber-regulation product, so the size test that matters for most feed mills and compounders is the general one, not a timber carve-out. Which EUDR deadline applies to you walks through the staff, turnover and balance-sheet thresholds under Directive 2013/34/EU that decide your size band. The European Commission's May 2026 simplification review (COM(2026) 191) confirmed both dates are holding and did not reopen them — the review's changes were to process and guidance, not to the timeline.
What to collect from a soya supplier
A request for "your EUDR paperwork" gets a shrug. A request for this gets a usable answer:
- Confirmation of which Annex I CN code the shipment is sold under (1201, 1208 10, 1507 or 2304), since that is what determines whether it is in scope at all.
- Geolocation points or polygons for every plot of origin, not an aggregate region.
- Confirmation the soya was produced on land that was not deforested or degraded after 31 December 2020.
- Evidence of lawful production in the country of origin — land use permits, land tenure, and compliance with local environmental and labour law.
- If your supplier is not the first operator, confirmation that a due diligence statement was already filed for that specific shipment, with a reference you can hold against your own five-year record-keeping obligation.
Where a trader cannot produce plot-level geolocation because the shipment has already been pooled across multiple farms with no record kept of which, that is a sourcing risk to address now, not a gap to paper over with a country-level assurance.
Check what the EUDR requires for your soya or feed business and get a dated list of what to ask suppliers for, rather than working it out shipment by shipment.
General information about Regulation (EU) 2023/1115 as amended, not legal advice. EUDR scope is determined by customs (CN) code — confirm your own classifications before acting on this. Checked against primary sources on .
Frequently asked
01Is compound animal feed covered by the EUDR?
No. Compound and mixed animal feed preparations, classified under CN 2309, are not in Annex I and carry no EUDR obligation of their own. The Commission considered adding them during drafting and decided not to. The obligation sits with the Annex I soya, palm or other regulated material used to make the feed, not the finished feed product.
02Is soybean meal covered by the EUDR?
Yes. Soybean meal — the oilcake left after oil extraction, CN code 2304 — is explicitly in Annex I. It is the highest-volume soya product most EU feed businesses actually handle, and it is squarely in scope even though the finished compound feed made from it is not.
03Who has to file the due diligence statement in a soya-to-feed supply chain?
Whoever first places the Annex I soya product (beans, meal, flour or oil) on the EU market, typically an importer, crusher or trading house. A feed compounder that buys already-placed meal from an EU supplier does not normally need to file its own statement for that material, but it does need to be able to show the material it bought was covered by one.
04Does soya for sowing need a due diligence statement?
No, not since September 2026. Commission Delegated Regulation (EU) 2026/2102 removed soya beans intended for sowing from Annex I. Soya bought for crushing into meal or oil, or fed whole, was unaffected by this change and remains in scope.
05Is Brazilian soya low risk or standard risk under the EUDR?
Standard risk. Brazil, the EU's largest single supplier of soybean meal, is benchmarked standard, not low, under Implementing Regulation (EU) 2025/1093. Only US-origin soya currently falls in the low-risk tier among major exporters, which unlocks simplified due diligence under Article 13.
06Does soya get a geolocation simplification like cattle does?
No. Cattle only needs one coordinate point per establishment regardless of size. Soya follows the standard rule: a point for any plot of 4 hectares or less, and a full polygon above that threshold, for every plot the soya was grown on.
07By when does a feed business have to comply with the EUDR?
30 December 2026 for large and medium operators and traders. 30 June 2027 for most micro and small operators, since soya was never a timber-regulation product and does not qualify for the earlier micro/small carve-out that applies to some other commodities.
08Did the Commission's 2026 simplification review change the soya rules or deadlines?
No. The Commission's May 2026 simplification review, published as COM(2026) 191, introduced process and guidance changes aimed at cutting compliance costs, but it confirmed the 30 December 2026 and 30 June 2027 deadlines rather than reopening them.
Sources
- [1]Regulation (EU) 2023/1115 on deforestation-free products (EUR-Lex)
- [2]Regulation (EU) 2025/2650 amending the EUDR (EUR-Lex)
- [3]Commission Delegated Regulation (EU) 2026/2102 (Official Journal, EUR-Lex)
- [4]Commission Implementing Regulation (EU) 2025/1093 — country benchmarking (EUR-Lex)
- [5]European Commission report on EUDR simplification review, COM(2026) 191 final
- [6]FEFAC Professional Recommendation on EUDR implementation
- [7]USDA FAS GAIN report: EU adopts changes to Deforestation Regulation