EUDR for garden timber merchants: decking, fencing, sleepers
Decking and sleepers face the 30 December 2026 EUDR date whatever your size. Fence panels and pointed stakes can get the extra six months. Here's why, by CN code.
On this page
- 01Why one yard has two deadlines
- 02Decking: almost always 2026, whatever your size
- 03Fencing splits by how the timber was cut
- 04Sleepers: check whether yours are actually new timber
- 05What you need before you can file, for the 2026 products
- 06If you qualify for the 2027 extension, use the time well
- 07Questions garden and landscaping merchants actually ask
- 08Confirm your own product mix
Garden and landscaping timber merchants face two different EUDR dates on the same forecourt: decking boards and sleepers, already covered by the old EU Timber Regulation, must comply by 30 December 2026 whatever your size, while fence panels and pointed stakes, which were not, can get the micro and small operator extension to 30 June 2027.
Why one yard has two deadlines
The EUDR's application date doesn't run by product category, trade, or shop floor — it runs by the Combined Nomenclature (CN) code each product is classified under, and whether that code was already inside the EU Timber Regulation (EUTR), which the EUDR replaced. Regulation (EU) 2025/2650 gave micro and small operators until 30 June 2027, but withheld that extension from any CN code the EUTR already covered.
Most garden timber lines were already EUTR products. A few weren't, because the EUTR's own annex was narrower than the EUDR's. That gap is exactly where garden and landscaping merchants sit:
| CN code | Typical garden product | Was it an EUTR product? | Application date |
|---|---|---|---|
| 4407 | Sawn fence posts, rails, gravel boards, featheredge, sawn decking boards | Yes | 30 December 2026, all sizes |
| 4409 | Grooved or reeded (profiled) decking boards, edging strip | Yes | 30 December 2026, all sizes |
| 4406 | Timber sold and classified as railway or tramway sleepers | Yes | 30 December 2026, all sizes |
| 4404 | Round, pointed fence posts and stakes not sawn lengthwise (pea sticks, plant stakes, round fencing stakes) | No | 30 December 2026 large/medium; 30 June 2027 micro/small |
| 4421 | Pre-assembled fence panels, trellis, planters and other made-up wood articles | No | 30 December 2026 large/medium; 30 June 2027 micro/small |
A merchant selling sawn decking in one aisle and pre-assembled lap panels in the next is, correctly, working to two dates for the same shipment of timber.
Decking: almost always 2026, whatever your size
Decking boards are either sawn flat (CN 4407) or continuously shaped — grooved, reeded, chamfered — along their length (CN 4409). Both headings were EUTR products from the outset, so the 2025/2650 extension never reached them. There is no size-based reprieve: a two-person garden centre importing reeded softwood decking faces the same 30 December 2026 date as a national builders' merchant.
Our construction timber and decking guide covers 4407 and 4409 in more depth for the building trade; the obligations and the date are identical when the same boards are sold for a garden rather than a building.
Fencing splits by how the timber was cut
Fencing is where classification actually changes your date, because "fencing" is not one CN code:
- Sawn fence components — square posts, arris rails, gravel boards, featheredge boards cut from timber sawn lengthwise — sit under CN 4407, same as decking. These face 30 December 2026 regardless of size.
- Round, pointed stakes and posts that are not sawn lengthwise — pointed round fencing stakes, pea sticks, bean poles, plant stakes — sit under CN 4404 (hoopwood; split poles; piles, pickets and stakes of wood, pointed but not sawn lengthwise). The EUTR never covered this heading, so micro and small operators placing these products on the market get until 30 June 2027.
- Pre-assembled fence panels — lap panels, picket panels, trellis, and similar made-up timber articles — sit under CN 4421, "other articles of wood." This heading was also outside EUTR scope, so the same 30 June 2027 date applies to micro and small operators.
The practical effect: a small garden centre importing round pointed stakes and flat-pack fence panels can genuinely wait until mid-2027 for those two lines, while the sawn gravel boards sold alongside them are already due in December 2026. Get your supplier's CN classification in writing for each product line rather than assuming "it's all fencing, it's all one date" — that assumption is the single most common mistake this sector makes.
Sleepers: check whether yours are actually new timber
"Garden sleepers" covers two different products with two different EUDR positions:
- New-sawn softwood or hardwood sleepers, cut and sold for landscaping rather than rail use, are typically classified by customs under CN 4407 as sawn timber rather than CN 4406, unless the supplier's commodity code specifically declares them as railway or tramway sleepers. Either way, both 4406 and 4407 were EUTR products, so new sleepers face 30 December 2026 whatever your size.
- Genuinely reclaimed, ex-service railway sleepers, resold for landscaping without further processing, can fall outside EUDR scope altogether under the Regulation's exclusion for products made entirely from recovered material that would otherwise be discarded as waste. This is not automatic: you must be able to evidence on request that the sleepers are 100% genuine reclaimed material, not a mix of reclaimed and newly sawn stock. Our guide to recycled and reclaimed wood scope sets out what that evidence needs to look like and where the exemption stops applying.
If you sell both lines, keep the paperwork separate. A batch of genuine reclaimed sleepers with no evidence trail does not default to "probably exempt" — it defaults to in scope, because the burden of proof sits with you.
What you need before you can file, for the 2026 products
Wherever your product lands on 30 December 2026 — decking, sawn fencing, or sleepers — the due diligence obligation is the same:
- Species and country of harvest for each batch.
- Geolocation of the harvest plot — points under 4 hectares, polygons above — from your sawmill or timber supplier. See our geolocation requirements guide.
- Evidence of deforestation-free status after 31 December 2020 and lawful harvest under the country of origin's laws.
- A risk assessment informed by the country's benchmarked risk category under Implementing Regulation (EU) 2025/1093.
- A Due Diligence Statement filed through TRACES before the timber is placed on the market — our step-by-step TRACES guide walks through filing.
If you buy pre-cut decking or sawn fencing from an EU merchant who has already filed, you hold the role of downstream trader for that batch and keep their statement reference rather than filing your own. Confirm this in writing — do not assume it.
If you qualify for the 2027 extension, use the time well
Micro and small operators working the 2027 date for pointed stakes or assembled fence panels still have to do the same due diligence eventually; the extension buys time, not an exemption. Our micro and small operator simplifications guide sets out what is actually simplified for smaller businesses under the amended Regulation and what isn't, and is a practical starting point if you have no dedicated compliance function.
Questions garden and landscaping merchants actually ask
Does decking get the small-business extension to June 2027? No. Sawn decking (CN 4407) and profiled, grooved decking (CN 4409) were both EU Timber Regulation products, so every operator faces 30 December 2026 regardless of size.
Our fence panels are flat-packed and assembled in-store — does that change the CN code? No. Classification follows the product as placed on the market, not where final assembly happens. Pre-made panels assembled from components you supply are still CN 4421 articles.
Are round, pointed fence posts treated differently from square sawn ones? Yes. Round posts pointed but not sawn lengthwise sit under CN 4404, which the EU Timber Regulation never covered, so micro and small operators get until 30 June 2027. Square posts cut from sawn timber sit under CN 4407 and face 30 December 2026 regardless of size.
We sell reclaimed railway sleepers — are they definitely exempt? Only if you can evidence they are made entirely from genuine recovered material that would otherwise be discarded as waste. A mix of reclaimed and new-sawn stock, or sleepers you cannot evidence as 100% reclaimed, stays fully in scope.
Does FSC or PEFC certification on our timber reduce what we need to collect? No. Certification supports your risk assessment but does not replace geolocation data or the Due Diligence Statement itself.
Did the September 2026 Annex I changes (Delegated Regulation (EU) 2026/2102) affect decking, fencing or sleeper products? No. That delegated act removed items including cattle hides and re-treaded tyres, and added soluble coffee, frozen cattle tongues and further palm oil derivatives from 30 December 2027. None of the wood headings used for decking, fencing or sleepers (4404, 4406, 4407, 4409, 4421) were touched.
We're a small garden centre buying pre-made panels from a UK wholesaler — do we need to do anything before 2027? Check now whether your wholesaler is itself placing the panels on the EU market or whether that happens earlier in the chain. If you are the first business to place imported panels on the EU market, you are the operator and the obligation is yours on your applicable date, not your wholesaler's.
What happens if we mix sawn and reclaimed sleepers in the same batch from a supplier? The batch does not qualify for the recovered-material exemption. Keep reclaimed stock separate, with supplier evidence of its origin, if you want to claim it is out of scope.
Confirm your own product mix
The fastest way to find your actual deadlines is to list every garden timber line you sell against its CN code, not against how it's described on your shelf labels — "fencing" and "sleepers" each cover products with different dates.
Check which EUDR obligations and dates apply to your product range and get a plan ordered by which lines are due first.
General information about Regulation (EU) 2023/1115 as amended, not legal advice. EUDR scope is determined by customs (CN) code — confirm your own classifications before acting on this. Checked against primary sources on .
Frequently asked
01Does decking get the small-business extension to June 2027?
No. Sawn decking (CN 4407) and profiled, grooved decking (CN 4409) were both EU Timber Regulation products, so every operator faces 30 December 2026 regardless of size.
02Our fence panels are flat-packed and assembled in-store — does that change the CN code?
No. Classification follows the product as placed on the market, not where final assembly happens. Pre-made panels assembled from components you supply are still CN 4421 articles.
03Are round, pointed fence posts treated differently from square sawn ones?
Yes. Round posts pointed but not sawn lengthwise sit under CN 4404, which the EU Timber Regulation never covered, so micro and small operators get until 30 June 2027. Square posts cut from sawn timber sit under CN 4407 and face 30 December 2026 regardless of size.
04We sell reclaimed railway sleepers — are they definitely exempt?
Only if you can evidence they are made entirely from genuine recovered material that would otherwise be discarded as waste. A mix of reclaimed and new-sawn stock, or sleepers you cannot evidence as 100% reclaimed, stays fully in scope.
05Does FSC or PEFC certification on our timber reduce what we need to collect?
No. Certification supports your risk assessment but does not replace geolocation data or the Due Diligence Statement itself.
06Did the September 2026 Annex I changes (Delegated Regulation (EU) 2026/2102) affect decking, fencing or sleeper products?
No. That delegated act removed items including cattle hides and re-treaded tyres, and added soluble coffee, frozen cattle tongues and further palm oil derivatives from 30 December 2027. None of the wood headings used for decking, fencing or sleepers were touched.
07We're a small garden centre buying pre-made panels from a UK wholesaler — do we need to do anything before 2027?
Check now whether your wholesaler is itself placing the panels on the EU market or whether that happens earlier in the chain. If you are the first business to place imported panels on the EU market, you are the operator and the obligation is yours on your applicable date, not your wholesaler's.
08What happens if we mix sawn and reclaimed sleepers in the same batch from a supplier?
The batch does not qualify for the recovered-material exemption. Keep reclaimed stock separate, with supplier evidence of its origin, if you want to claim it is out of scope.
Sources
- [1]Regulation (EU) 2023/1115 on deforestation-free products (EUR-Lex)
- [2]Regulation (EU) 2025/2650 amending the EUDR application dates (EUR-Lex)
- [3]Regulation (EU) No 995/2010, the EU Timber Regulation (EUR-Lex)
- [4]European Commission — Regulation on deforestation-free products overview
- [5]European Commission — Commission updates product scope and tools to support EUDR (13 July 2026)